Action Day

poster

BIKE PATHS
DESCRIPTION OF THE ACTIVITY:
The main idea was Paint the Street with different colours using recycling bottles of water. It was designed strategic paths with fives meeting point were people was able to stop and refill the paint bottles.

Untitled-2

BICYCLE PARKING
DESCRIPTION OF THE ACTIVITY:
As the final biclycle paths stop we design a temporary and innovative biclycle parking. It was located strategically in the main bridge, where there is huge flow of people on Saturdays because it conects the main square with the korzo (way that citizens use for going to the Saturday´s bazar).

During the observatory activities we realized that the bicycles is a reality in the city, citizens use it in their routine life and you can see bicycle parked all over the city.

234

PAINTING THE PAVEMENT ACTIVITY
DESCRIPTION OF THE ACTIVITY:
In order to connect the bike paths activity, the bicycle parking structure and the square we design a specific painting activity with a group of children.
Because this activity was developed in the main bridge we design a specific pattern to connect the Korzo with the plaza. We create different templates for spray paint inspired in the typical fishes of the lake, Eels and Trofta and bicycle wheels as bubbles.

1

434

3496

SQUARE ACTIVITIES
Different activities in the plaza were designed, where recreation meets the data-collecting.
The main square of the city is currently known for being occupied by a parking lot, where the only space inside which works as a social space, enclosing it from the streets and the river.

Untitled-3

DSC_3541

DSC_3553

SURVEY
-Collect data.